Skip to content
SAT · Algebra

Work problems

Work problems appears in 4 reviewed SAT questions and sits in Algebra. Below are worked examples showing exactly how the exam tests it, with the answer marked and every distractor explained.

How Work problems is tested

Example 1Harder
A worker can paint a house in 8 hours working alone. Another worker can paint the same house in 12 hours. How long will it take them to paint the house working together?
  1. A5 hours
  2. B3.5 hours
  3. C4.8 hoursCorrect
  4. D10 hours

Why C is right

Combined rate = 1/8 + 1/12 = 3/24 + 2/24 = 5/24 per hour. Time = 1 / (5/24) = 24/5 = 4.8 hours. The result follows directly from the numbers and operations given in the problem.
Why the other 3 choices miss
A
Incorrect: This results from averaging the two times: (8 + 12) / 4 = 5, which is not the correct method.
B
Incorrect: This results from computing (8 + 12) / (2 × 3) = 3.5, which is not a valid work-rate method.
D
Incorrect: This results from adding the two individual times, 8 + 12 = 20, and halving to get 10 — an incorrect approach.
Example 2Harder
Two pipes fill a pool. Pipe A fills it in 6 hours and Pipe B fills it in 4 hours. Working together, how long does it take to fill the pool?
  1. A10 hours
  2. B2 hours
  3. C5 hours
  4. D2.4 hoursCorrect

Why D is right

Combined rate = 1/6 + 1/4 = 2/12 + 3/12 = 5/12 per hour. Time = 1 ÷ (5/12) = 12/5 = 2.4 hours. The result follows directly from the numbers and operations given in the problem.
Why the other 3 choices miss
A
Incorrect: 10 hours = 6 + 4, simply adding the individual times, which ignores the combined rate.
B
Incorrect: 2 hours would require combined rate of 1/2 per hour; actual rate is 5/12 per hour.
C
Incorrect: 5 hours results from adding the times (6 + 4 = 10) and then halving, which is incorrect.
Example 3Medium
Pipe A can fill a tank in 6 hours. Pipe B can fill the same tank in 4 hours. Working together, how many hours does it take to fill the tank?
  1. A2.4 hoursCorrect
  2. B2.5 hours
  3. C10 hours
  4. D5 hours

Why A is right

Combined rate = 1/6 + 1/4 = 2/12 + 3/12 = 5/12 per hour. Time = 12/5 = 2.4 hours. The result follows directly from the numbers and operations given in the problem.
Why the other 3 choices miss
B
Incorrect because 2.5 is a common estimate but does not follow from the formula 1/T = 1/6 + 1/4.
C
Incorrect because 10 = 6 + 4, adding the individual times instead of adding the individual rates.
D
Incorrect because 5 = (6 + 4)/2 is the arithmetic average; work rates combine as fractions, not averages.

Studied alongside

Other concepts from Algebra.